Brewery Construction Guide

The following is a step-by-step guide to the construction of a complete home brewery system. Designed with burner heat shielding and built-in plumbing for mash, cooling and cleaning water re-circulation. The guide includes plans for both an immersion chiller and my own counter-flow heat exchanger design. The pump is setup for quick replacement. The electrical plan has been designed to allow the heater to activate only when the pump is operating and includes an optional manual backup in the event of heating control system failure.

Robert A. Haskell

Brewery
Immersion Chiller Back of Kettle Kettle Mash Tun HLB

Beer
It is the drink of men who think
And feel no fear nor fetter

Who do not drink to senseless sink

But drink to think the better

Anonymous


Email Address: haskellra@hotmail.com

This page designed and produced by Donald S. Chrzan
Site last updated: 27-aug-06 3:40